L5 logo

Zoning & Bylaw Assistant Canadian

A construction tool & estimator for understanding zoning & bylaws

What do you want to build, and where?

Kingston · free: F1 “What can I do here” for one address. Full answers F1–F5 after sign-in.

1I am a
2Scale

Tiers split by the Building Code: Part 9 is 3 storeys or fewer and 600 m² or less (O. Reg. 332/12 Div. A 1.1.2.4); bigger buildings, and assembly, care or high-hazard uses, are Part 3 (1.1.2.2).

3What

T1 · Home

T2 · Small building / multi-unit

T3 · Commercial / industrial / institutional

T4 · Major development / high-rise

T5 · Land and lot changes

4Size and details (leave blank if not sure)
Which permit type applies
Shed and deck thresholds; the fee basis
Deck permit trigger (about 0.6 m / 2 ft)
More than 3 storeys means Building Code Part 3
More than 600 m² means Part 3, and an engineer for demolition
→
Multi-unit permit path; ARU rules
→
Part 3 or Part 9; change-of-use analysis
Building fee basis
Letter of Use; zoning use check
Letter of Use for industrial storage
NFPA 96 kitchen exhaust drawings
Minor variance or rezoning branch
10 m² vs 15 m² permit trigger
Pool enclosure permit over 600 mm
Locking-cover hot tubs are exempt
Tree permit
Septic permit; site servicing drawings
Consent vs subdivision; zone lot-area test
Zone frontage test
Consent (one lot) vs plan of subdivision (several lots)
Conditional permit; occupancy before completion
Owner authorization forms
5Where: address or roll number

Sign in

About us · FAQ · Pricing